ISO 9001 Certified · FRP/GRP Grating Manufacturer · Since 2004 · Exporting to 45+ Countries

Engineering Case Studies

Real FRP grating projects, real engineering parameters, real inspection results.

These six projects complement the existing client reference gallery at /case-studies/. Each one documents the background, design parameters, solution and measured outcomes — resin choice, span, live load, deflection limit, fastener grade and post-installation inspection data are all recorded so engineers can cross-check their own specifications. Where clients requested confidentiality, industry and geography are described rather than named.

Chemical Processing

Acid Area Walkway Replacement

Vinyl ester molded grating replaced steel walkways in a HCl / H₂SO₄ processing area. Steel corroded through in 6 years; the FRP system showed zero corrosion after 2 years.

  • Resin: ZeAll VE vinyl ester
  • Panel: 38 mm molded
  • Area: 240 m²
  • Life: ~25 yrs vs 6 yrs steel
Read case study →
Water & Wastewater

Tank-Top & Catwalk Installation

850 m² of isophthalic molded grating across 12 aeration and clarifier tanks, eliminating H₂S corrosion and biological-slip hazards on aluminum catwalks.

  • Resin: ZeAll ISO isophthalic
  • Panel: 38 mm molded, 1220×3660
  • Area: 850 m²
  • Inspection: 3-yr excellent
Read case study →
Oil & Gas / Offshore

Helideck Perimeter & Walkways

50 mm pultruded grating with fire-retardant vinyl ester and phenolic escape-route panels, reducing topside weight by ~8 tonnes and meeting ABS / IMO fire requirements.

  • Resin: ZeAll FR + phenolic
  • Panel: 50 mm ZeAll Pultruded
  • Area: 420 m²
  • Weight: 75% lighter vs steel
Read case study →
Food & Beverage

Washdown Production Floor

FDA-compliant molded grating over drainage trenches in a beverage bottling plant, replacing epoxy-coated concrete that deteriorated within 2 years under caustic washdowns.

  • Resin: FDA-grade vinyl ester
  • Panel: 38 mm molded, mini-mesh
  • Area: 560 m²
  • Compliance: FDA 21 CFR 177.2420
Read case study →
Power & Energy

Cooling Tower & Transformer Platform

380 m² cooling-tower walkways plus 120 m² non-conductive FRP platforms around 110 kV transformers, eliminating step-and-touch voltage hazard.

  • Resin: ZeAll ISO + ZeAll VE
  • Panel: 38 mm molded
  • Area: 500 m² total
  • Dielectric: >10 kV/mm
Read case study →
Marine & Coastal

Passenger Ferry Terminal Decking

Grit-top vinyl ester grating on the boarding gangway and waiting area, eliminating wet slip-and-fall claims and summer foot-burn issues from hot steel and rotting wood.

  • Resin: ZeAll VE, UV-stabilized
  • Panel: 38 mm molded, gray
  • Area: 320 m²
  • Wet COF: >0.7
Read case study →

Need a Reference for Your Project?

Send your load and chemical exposure data and we will match you to a comparable ZeAllgrate reference installation.